top of page
Marbas Logo

Craven Court, Bournemouth

Apartment block on the east side of Bournemouth, commissioned by BCP Council. Working alongside Amiri Construction & PDP Architects the building is formed using traditional masonry walls with precast concrete planks for the floors. The top floor is inset and was formed using a load bearing structural framing system (SFS).

Sector:

Residential

Client:

BCP Council

Project Value:

£3m

Year Completed:

2024

bottom of page